Concrete Slabs in Sydney for Sheds, Garages and Patios

Shed and garage slabs, carport and patio slabs, alfresco areas and slabs for extensions and granny flats, built to the plans where there are plans and to sound practice where there are not.

Concrete being discharged from a crane kibble onto steel mesh for a new slab

Concrete slabs, from garden shed to garage

A slab is the simplest concrete job to describe and one of the easiest to get wrong. It has to be level where it should be level, fall where water must run away, and stay in one piece on ground that may swell and shrink with the seasons. Most of that is decided before a single load of concrete arrives.

We arrange concrete slabs across Sydney for:

  • Garden sheds and workshops, from small kit sheds to larger steel sheds that need hold-down bolts set in.
  • Garages and carports, often with thickened edges to carry the walls or posts.
  • Patios and alfresco areas off the back of the house, where falls away from the door are critical.
  • Extensions, studios and granny flats, where the slab is a structural element designed by an engineer.
  • Bin areas, hardstands and AC unit pads, small jobs that are often done alongside a bigger pour.

Ground first

Sydney's soils vary from street to street. On shale-derived clay in Western Sydney and the Hills District, the ground moves with moisture, and structural slabs are designed to suit the site's reactivity. On sandstone areas of the North Shore and the Eastern Suburbs, excavation can hit rock, which needs breaking and costs time. On sandy ground, compaction and edge containment matter. The concreter looks at the ground, any slope and the access before pricing.

How a slab is built

Set-out and excavation

The slab is marked out from the plans or agreed dimensions. Topsoil and soft material are removed so the slab sits on firm ground. On sloping blocks, one side may need cut and the other fill, and fill must be compacted in layers or it will settle.

Base, membrane and formwork

A compacted granular base gives an even platform. Where the slab will be inside or under flooring, a vapour barrier goes down next. Formwork is set to the finished height and falls. Thickened edges or internal beams are dug and shaped at this stage.

Reinforcement and services

Mesh or bar is placed on chairs at the specified height, with extra bars at edges and corners where drawings call for them. Plumbing pipes, electrical conduits and hold-down bolts are positioned before the pour, because they are very hard to add later. If an inspection is required before pouring, it happens now.

Worker in a hard hat standing on a reinforcement mat ready for a slab pour

Pour, finish and cure

Concrete is placed, vibrated where needed, screeded to level and finished. A steel trowel finish suits garage and shed floors; a broom finish suits outdoor patios. Joints are tooled or saw cut. Then the slab is kept moist or covered while it cures. Loading it too early, or letting it dry in hot wind, weakens the surface.

Approvals for slabs

Some small slabs and paving fall under exempt development in NSW, as long as they meet conditions on size, location and drainage. Garages, larger sheds, carports and anything structural often need a development approval or complying development certificate. Slabs near sewer mains can also need Sydney Water's approval to build over or next to the pipe. Check with your council or a certifier before the pour if you are unsure, and before you dig, request plans through Before You Dig Australia.

Pricing a slab

Size alone does not set the price. Excavation, rock, access for a truck or pump, thickened edges, reinforcement and finish all add up. The price guide has 2026 planning bands for plain concrete slabs, and the concreter will give you a written figure after measuring. If the slab will later be polished, read our polished concrete page first.

What the quote should cover

  1. Slab dimensions, thickness and any thickened edges or internal beams
  2. Whether the price follows engineer's drawings, and which revision
  3. Excavation, removal of spoil and any rock breaking
  4. Base material, compaction and the vapour barrier under the slab
  5. Reinforcement type and how it is supported
  6. Plumbing or electrical conduits set in before the pour, and who provides them
  7. Finish: steel trowel, broom, or prepared for later polishing
  8. Curing method and when the slab can be built on

Missing lines are worth asking about before you sign. How Sydney concrete prices are built.

FAQs

Questions people ask before they commit

Do I need an engineer for a shed or garage slab?

Larger slabs, slabs carrying structures and slabs on difficult ground are often designed by an engineer, and a certifier or council may require it as part of an approval. Small garden shed bases often are not. If your shed or garage needs approval, the approval documents will usually say what is needed.

How long does a concrete slab take?

Set-out, excavation, formwork and reinforcement can take a day or more, and the pour itself is usually a single day. Concrete then needs time to cure before it is loaded. Rain on the forecast can move a pour date.

What is the plastic sheet under a slab for?

It is a vapour barrier that slows moisture rising from the ground into the slab. It matters most under slabs that will be inside a building or covered with flooring. It should be lapped and taped, not torn.

Can a slab be poured on clay?

Yes, much of Sydney's housing sits on clay. Reactive clay moves with moisture, so slabs on it rely on suitable footings or edge beams, good reinforcement and drainage that keeps water away from the edges. Structural slabs on reactive sites are designed to suit the site classification.

Can a new slab be polished later?

Yes, if it is planned that way. Tell the concreter before the pour so the mix, the finishing and the protection afterwards suit polishing. See our polished concrete page for what that involves.

Free, no-obligation

Get your free quote today

Send us the job details

Concrete Company Sydney Call (02) 5565 8218 Free on-site quote
Call (02) 5565 8218